시험덤프
매달, 우리는 1000명 이상의 사람들이 시험 준비를 잘하고 시험을 잘 통과할 수 있도록 도와줍니다.
  / L5M8 덤프  / L5M8 문제 연습

CIPS L5M8 시험

Project and Change Management 온라인 연습

최종 업데이트 시간: 2025년12월09일

당신은 온라인 연습 문제를 통해 CIPS L5M8 시험지식에 대해 자신이 어떻게 알고 있는지 파악한 후 시험 참가 신청 여부를 결정할 수 있다.

시험을 100% 합격하고 시험 준비 시간을 35% 절약하기를 바라며 L5M8 덤프 (최신 실제 시험 문제)를 사용 선택하여 현재 최신 88개의 시험 문제와 답을 포함하십시오.

 / 2

Question No : 1


Yes Ltd is a consultancy organisation running many projects simultaneously. Fiona, the CEO, claims that all projects should use project management software. Is this correct?

정답:
Explanation:
The guide explains that software should only be used if it adds value to project control and efficiency.
For small, low-complexity projects, it might be unnecessary or uneconomical.
Reference: CIPS L5M8 Study Guide, p.71.

Question No : 2


In the project lifecycle, which of the following stages is completed last?

정답:
Explanation:
The final step in the lifecycle is the review stage, following closure. It evaluates project success against objectives and captures lessons learned for future improvement.
Reference: CIPS L5M8 Study Guide, p.66.

Question No : 3


The Critical Chain Methodology of project management removes what from a project in order to improve efficiencies?

정답:
Explanation:
Critical Chain Project Management (CCPM) eliminates individual task safety buffers, consolidating
them into a single project buffer to reduce delays and improve efficiency.
Reference: CIPS L5M8 Study Guide, pp.58C61.

Question No : 4


Michael is the head of the Steering Committee at ABC Consultancy and must allocate resources to several projects. One project is suffering delays due to lack of staff. Should Michael reallocate resources to this project?

정답:
Explanation:
The guide advises against diverting resources to one delayed project, as this can create competition and resentment across teams and may cause a domino effect of further delays. Balanced prioritisation is required.
Reference: CIPS L5M8 Study Guide, p.49.

Question No : 5


Which of the following is a root cause of 'resource allocation syndrome'?

정답:
Explanation:
Resource allocation syndrome, as described by Engwall and Jerbrant, occurs when multiple projects compete for limited resources in multi-project environments. The shortage leads to delays and conflicts between project teams.
Reference: CIPS L5M8 Study Guide, p.48.

Question No : 6


According to Cox’s Stepladder of Relationships, which of the following sits outside of ‘procurement and supply relationships’?

정답:
Explanation:
In Cox’s Stepladder model, mergers and acquisitions are not part of buyerCsupplier relationship levels. They are described as a core competency, representing full organisational integration beyond contractual relationships.
Reference: CIPS L5M8 Study Guide, p.40.

Question No : 7


Ian is a Project Manager for a large construction project involving the building of a new hospital. A complex supply network is involved which includes the use of several subcontractors.
Which of the following would be the best method for dealing with subcontractors for this project?

정답:
Explanation:
The guide recommends early involvement of subcontractors in complex projects. This ensures clarity in expectations, communication, and alignment before execution, enhancing performance and collaboration.
Reference: CIPS L5M8 Study Guide, p.32.

Question No : 8


The influence of the supply chain network can enable an organisation to benefit from increased
absorptive capacity.
What is meant by 'absorptive capacity'?

정답:
Explanation:
Absorptive capacity is the organisation’s ability to recognise, assimilate, and apply new knowledge from external partners to improve performance and add value.
Reference: CIPS L5M8 Study Guide, p.29.

Question No : 9


The analysis of roles, relationships and interdependencies within the supply chain network requires evaluation only at the start of a project. Is this correct?

정답:
Explanation:
The CIPS guide highlights that supply network roles and relationships evolve during project execution. Therefore, they must be reviewed regularly, not just initially, to maintain alignment and manage interdependencies effectively.
Reference: CIPS L5M8 Study Guide, p.26.

Question No : 10


At which stage of the project lifecycle is a kick-off meeting usually held and the project is assigned a budget?

정답:
Explanation:
The initiation stage follows the strategic stage in the project lifecycle. Here, project approval is granted, the kick-off meeting occurs, and a budget is formally assigned. This ensures stakeholder alignment before detailed planning begins.
Reference: CIPS L5M8 Study Guide, p.18.

Question No : 11


XYZ Ltd is running a new project examining a possible expansion of its current offering. The project lead has identified stakeholders to keep up-to-date. One stakeholder has high power but low interest.
Which communication strategy is most appropriate?

정답:
Explanation:
Using the Mendelow matrix: stakeholders with high power/low interest should be kept satisfied― engage sufficiently to maintain support without over-loading them.
Reference: CIPS L5M8 Study Guide, pp.8C9.

Question No : 12


Which of the following are often considered the success factors for a project? Select TWO

정답:
Explanation:
Core success factors highlighted include robust planning and clear, well-defined objectives/requirements. Projects don’t inherently need large budgets to be successful, and external stakeholders may not always be central.
Reference: CIPS L5M8 Study Guide, p.3 (Varejão/CIPS discussion of success factors).

Question No : 13


Which of the following describes a change in which there is a series of rapid and simultaneous changes, fundamentally altering the way a business functions?

정답:
Explanation:
Reconstruction involves rapid, often concurrent changes that significantly shift the organisation’s functioning (distinct from evolution/adaptation’s incrementalism and from a single radical revolution).
Reference: CIPS L5M8 Study Guide, p.89 (see pp.88C100 for the four types).

Question No : 14


At Playground Incorporated there is a particular project management structure in which a traditional hierarchical structure is used. When a project requires multiple departments, each department completes its aspect and then passes it along to the next. There is no need for an overarching Project Manager.
What type of structure is this?

정답:
Explanation:
A functional structure delivers projects through departmental silos (line hierarchy), handing work between functions; coordination is via line managers rather than a single project manager.
Reference: CIPS L5M8 Study Guide, p.173.

Question No : 15


Rachel is the Executive of a Project Board and is tasked with creating a Project Initiation Document (PID).
Which of the following is TRUE about this document? Select TWO

정답:
Explanation:
A PID is produced before delivery but can be updated as the project evolves. It should cover scope, objectives, constraints, risks, assumptions―i.e., both positive and negative aspects.
Reference: CIPS L5M8 Study Guide, pp.170C172.

 / 2
CIPS