시험덤프
매달, 우리는 1000명 이상의 사람들이 시험 준비를 잘하고 시험을 잘 통과할 수 있도록 도와줍니다.
  / 3V0-624 덤프  / 3V0-624 문제 연습

VMware 3V0-624 시험

VMware Certified Advanced Professional 6.5 – Data Center Virtualization Design Exam 온라인 연습

최종 업데이트 시간: 2024년12월12일

당신은 온라인 연습 문제를 통해 VMware 3V0-624 시험지식에 대해 자신이 어떻게 알고 있는지 파악한 후 시험 참가 신청 여부를 결정할 수 있다.

시험을 100% 합격하고 시험 준비 시간을 35% 절약하기를 바라며 3V0-624 덤프 (최신 실제 시험 문제)를 사용 선택하여 현재 최신 123개의 시험 문제와 답을 포함하십시오.

 / 4

Question No : 1


A company is designing a new vSphere cluster to support a mission-critical application.
• The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.
• The application consists of a group of 16 virtual machines, each with 8 vCPU configured.
Which solution satisfies the availability requirements?

정답:

Question No : 2


The hardware operations team is planning to purchase new ESXi hosts for the upcoming budget year and is requesting recommendations on the type of servers to purchase for a web application. The web application consists of hundreds of small virtual machines (1 vCPU and 8GB of RAM) that are members of a software cluster.
The solution should have these abilities:
• recover from ESXi host hardware failures
• zero downtime for a limited number of critical virtual machines (VMs)
• migrate running VMs between ESXi hosts without interruption to the operating system
• perform these functions using VMware ESXi servers, vCenter Server, and high-speed network interfaces
What are the three functional requirements and their associated VMware technologies? (Choose three.)

정답:

Question No : 3


A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
• The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
• The new servers have a 90-day delivery time.
• A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.
• The security team will continue to utilize its current investments and VM Encryption for the new environment.
• The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)

정답:

Question No : 4


The customer has two sites that must operate independently of each other in the event of a WAN failure. During normal operations, administrators from each site must be able to manage the other site through the vSphere Web Client.
Which vCenter Server Appliance (VCSA) and Platform Services Controller (PSC) diagram shows the VMware-recommended design that satisfies these requirements?



정답:
Explanation:
https://www.opvizor.com/understanding-the-impacts-of-mixed-version-vcenter-server-deployments/

Question No : 5


A customer is virtualizing a mission-critical Microsoft SQL database and needs a configuration that provides optimal NUMA performance.
• There are two possible clusters that the database virtual machine could reside in: Cluster A is vSphere 6.0 and Cluster B is vSphere 6.5.
• All ESXi hosts contain dual Intel Xeon E5-2650 v3 processors (ie: 2 socket, 10 cores per socket) and 256Gb RAM with vNUMA in its default configuration.
Given this scenario, which three statements are true? (Choose three.)
A. Enabling CPU Hot Add on a virtual machine will disable vNUMA.
B. Placing a 10 vCPU VM in Cluster A and configuring it with 2 Sockets and 5 Cores Per Socket will result in 2 vNUMA nodes.
C. Placing a 10 vCPU VM in Cluster B and configuring it with 2 Sockets and 5 Cores Per Socket will result in 2 vNUMA nodes.
D. Enabling Memory Hot Add on a virtual machine will disable vNUMA.
E. Placing the VM in Cluster B and configuring it with 5 Sockets and 2 Cores Per Socket will result in 1 vNUMA node.

정답: ABC
Explanation:
https://kb.vmware.com/s/article/2040375
http://www.techspresso.com/vm-sizing-best-practices-in-vsphere/
https://blogs.vmware.com/performance/2017/03/virtual-machine-vcpu-and-vnuma-rightsizing-rules-of-thumb.html

Question No : 6


An architect is designing a vSphere 6.5 implementation.
• The customer requires Cross vCenter vMotion for the newly-created data centers in New York and Houston.
• Each data center will use different IP networks for management and vMotion.
When creating a vMotion network, which two statements are required in order to use Cross vCenter Server vMotion? (Choose two.)

정답:

Question No : 7


DRAG DROP
Categorize the tools as providing either Availability or Recoverability.



정답:

Question No : 8


A customer is using blade servers with only one HBA.
Which two design concepts apply to this scenario? (Choose two.)
A. Assumption
B. Risk
C. Constraint
D. Requirement

정답: A,C

Question No : 9


A company has requested that a new vSphere 6.5 design be created.
• The existing environment consists of 32 vSphere 6.0 hosts attached to an iSCSI storage array.
• The storage arrays contain external customer financial and medical records used by the company's investment and medical services division.
The design must:
• protect the company's existing data center investment
• expand to a second data center site
• introduce process automation
• expand to and fail over to public cloud
Which two non-functional requirements are applicable for this design? (Choose two.)

정답:

Question No : 10


A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.
• The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.
• The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.
• QA Teams will be able to recreate the environment that is required for a specific application.
• Individual virtual machines in the blueprint are being continually updated with newly available software packages.
• The company is planning to use the vSphere Content Library to store images and synchronize them between sites.
Which four supported configurations can the company implement? (Choose four.)

정답:

Question No : 11


A company is implementing a new cluster to support its end user desktop workloads.
• The workload is required to support 200 virtual machines.
• Each end-user desktop is configured with two vCPUs, 8GB of RAM, and 40GB of thick-provisioned disk space.
• The architect has expressed concerns that virtual machine swap files will till the 8.5TB datastore available to the cluster.
Which two strategies would address the architect's concern? (Choose two.)

정답:

Question No : 12


DRAG DROP
Drag each option to its appropriate concept.



정답:

Question No : 13


A company is implementing a new ESXi host cluster at its New York data center.
• The CIO has stated that the new ESXi cluster should be deigned with enough failover capacity to sustain two ESXi host failures.
• Six ESXi hosts have been approved for this workload.
• The ESXi hosts are to be purchased from Dell with these specifications:
• 2x10 core 2.2GHz Intel CPU
• 128 GB of memory
• The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserved.
• All virtual machines should be protected by vSphere High Availability
Which are two true statements regarding failover capacity? (Choose two.)

정답:

Question No : 14


DRAG DROP
A customer is currently running a vCenter Server 5.5 environment with 48 identically-configured ESXi hosts.
• These ESXi hosts are divided into six 8-host HA/DRS clusters.
• The customer wants to upgrade to vSphete 6.5 and combine all of its ESXi hosts into a single 48-host HA/DRS cluster.
Place these actions in the correct order to accomplish this.



정답:

Question No : 15


DRAG DROP
A company has requested assistance with a new cross-site failover design between two sites which will support business-critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance
Drag each statement to its correct concept.



정답:

 / 4