시험덤프
매달, 우리는 1000명 이상의 사람들이 시험 준비를 잘하고 시험을 잘 통과할 수 있도록 도와줍니다.
  / HPE0-S58 덤프  / HPE0-S58 문제 연습

HP HPE0-S58 시험

Implementing HPE Composable Infrastructure Solutions 온라인 연습

최종 업데이트 시간: 2024년11월08일

당신은 온라인 연습 문제를 통해 HP HPE0-S58 시험지식에 대해 자신이 어떻게 알고 있는지 파악한 후 시험 참가 신청 여부를 결정할 수 있다.

시험을 100% 합격하고 시험 준비 시간을 35% 절약하기를 바라며 HPE0-S58 덤프 (최신 실제 시험 문제)를 사용 선택하여 현재 최신 59개의 시험 문제와 답을 포함하십시오.

 / 2

Question No : 1


A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.
Which procedure should the integrator use to address the customer’s concern?

정답:

Question No : 2


A customer needs to expand a single-frame Synergy solution to two frames.
What should the integrator do to establish a proper management network for the two frames?

정답:

Question No : 3


An integrator needs to configure a set of networks for Synergy compute nodes to send data to devices outside of a Synergy frame.
How should the integrator complete the task?

정답:

Question No : 4


A customer has a datacenter with 3-frame Master/Satellite Synergy solution. They plan to add two additional frames to the remote datacenter, but they want to have a single management tool.
How should the integrator set up the management of the datacenter?

정답:

Question No : 5


During a first-time installation of HPE Synergy, an external monitor is not available to the integrator.
Which approach should the integrator take to perform the first-time setup?

정답:

Question No : 6


A customer needs to deploy additional management components, such as vCenter Server and HPE Global Dashboard.
According to HPE best practices, how should an integrator deploy these components?

정답:

Question No : 7


DRAG DROP
Match each HPE server platform with optimal workload.



정답:

Question No : 8


A customer tries to revert a data volume located on the HPE 3PAR array to a specific snapshot that was taken using HPE Composer, but the process fails.
What must an integrator do to fix this problem?

정답:

Question No : 9


A customer needs to significantly improve I/O performance to a database server.
Which product should an integrator implement as part of a Synergy composable solution?

정답:

Question No : 10


HOTSPOT
An integrator needs to validate whether the datastore created for ESXi systems based on 3PAR virtual volume can support all DRS cluster functionalities.
Click on the parameter that the integrator needs to verify.



정답:

Question No : 11


An HPE Synergy compute module has a template-based server profile with two identically configured connections, each containing five VLANs.
What is the most efficient method the integrator can use to add a new VLAN to each connection?

정답:

Question No : 12


Which operating systems are supported for use with Image Streamer? (Choose two.)

정답:
Explanation:
Reference:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na­a00061945en_us&docLocale=en_US

Question No : 13


A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE Synergy platform.
Which steps must the integrator perform in the configuration to meet the customer’s needs?

정답:

Question No : 14


HOTSPOT
An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.



정답:


Explanation:
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=a00048164en_us

Question No : 15


A customer needs to deploy a farm of Windows Server 2019 Hyper-V using an Image Streamer. The customer discovered that the OS Build Plan for this OS is not available from the Image Streamer interface.
How can the customer access all the tools and scripts needed to provision the required operating system?

정답:
Explanation:
Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815217.pdf

 / 2